• Compliance with the HSE rules with the erection/finishing of designated subcontractors during the installation and completion of the WTG
• Monitoring and supervision of erection and completion of the WEA in terms of professional, technical, and high-quality performance of the work by the subcontractors.
• Training of colleagues and of sub-contractors on site
• Execution of the mechanical part of the quality check by using the checklist Q-Gate 23
• Check for completeness and accuracy of erection reports and the associated documents.
• Continuous improvement on documentation and processes in relation with area of responsibility
• Supporting the site manager with the inspection of incoming goods (gate1) on site.
• Creating reports according to the relevant NC process.
• Checking the tools brought and used by the subcontractor. Tools must be calibrated and be permitted.
• Control and hand out of special tools and equipment from the Nordex erection container to the subcontractor.
• Control of the correct torque applied on structural bolts, in accordance with the specifications.
• Technical guidance for corrective measures to remedy the defect by the subcontract tor.
• Notification of defective or missing parts to the site manager with the purpose of replacement of these parts.
• Checking of subcontractors in terms of qualification of the personnel: Certificates torque technology, service lift, fall protection.
• Reports to the site manager about the current status of erection and finishing works of the WTG.
• Creating the required documents specifically list of defects according Order Execution Process G0630_EN.
• Monitoring and supervision of erection and completion of the WEA in terms of professional, technical, and high-quality performance of the work by the subcontractors.
• Training of colleagues and of sub-contractors on site
• Execution of the mechanical part of the quality check by using the checklist Q-Gate 23
• Check for completeness and accuracy of erection reports and the associated documents.
• Continuous improvement on documentation and processes in relation with area of responsibility
• Supporting the site manager with the inspection of incoming goods (gate1) on site.
• Creating reports according to the relevant NC process.
• Checking the tools brought and used by the subcontractor. Tools must be calibrated and be permitted.
• Control and hand out of special tools and equipment from the Nordex erection container to the subcontractor.
• Control of the correct torque applied on structural bolts, in accordance with the specifications.
• Technical guidance for corrective measures to remedy the defect by the subcontract tor.
• Notification of defective or missing parts to the site manager with the purpose of replacement of these parts.
• Checking of subcontractors in terms of qualification of the personnel: Certificates torque technology, service lift, fall protection.
• Reports to the site manager about the current status of erection and finishing works of the WTG.
• Creating the required documents specifically list of defects according Order Execution Process G0630_EN.