To report to PrEM (Project Engineering Manager) for relevant progress of system engineering/interface/integration test activities.
To follow up the demonstration of compliance to the contractual requirements in subsystem interface/system level integration test.
The edition and submission to customer of Wanda Phase-2 System Level Documents, i.e. System Operation Plan, Emergency Evacuation Plan, System Functional Specification, Service Restore Analysis, etc.
The edition and submission to customer of Wanda Phase-2 Interface Package Document of E&M subsystems: to consolidate the interface documents from E&M subsystems and to edit submittal package to submit to customer.
The verification of system performance demonstration: to join together with engineering team to verify the demonstration activities of system performance criteria which stipulated in contractual PTS (Particular Technical Specification).
The execution of interface test with E&M subsystems: to monitor the progress of overall E&M interface tests arranged by the subsystems of WANDA Phase-2. In the event of issues during testing, the root causes of the interface problems shall be analysed and the recommended solutions to be proposed.
The development of system operational procedure : to develop the operational procedures of Wanda Phase-2 E&M System Level in which the stakeholders, i.e. operating and maintenance staffs, are identified and the distinct explanations, safe considerations and efficient means are addressed.