Back to jobsAssist to ensure the various KPI’s, mill throughput (670tph wet), milling efficiency (92% utilization), cyclone efficiencies (65% passing 106µm), recovery (96%), 1 elution strip per 12hour shift) at a given mill availability are achieved.
Assist to troubleshoot problems that hinder production and suggest possible recommendation for consideration.
Assist to ensure the efficient use of reagents to achieve maximum plant recovery and reagent optimisation.
Assist to ensure that the mills always run within established parameters (power, density, weight) for optimum operations.
